Automated HVAC Duct Forming and Welding Lines
Plan feeding, processing and unloading as one workflow. Start with your finished part, production target and the operations that take the most manual handling today.
Discuss your projectExplore HVAC duct fabrication ↓
What to configure for your application
Feeding and positioning
Define how blanks, sheets or tubes enter the line, how each part is located, and how material changes are handled.
Process integration
Evaluate forming, cutting, welding and transfers in the order your part requires. Review where the line needs buffers or inspection.
Output and handover
Agree on how cycle time, changeover and sample quality will be checked before shipment.
Automated Round Duct Rolling and Seam Welding Lines
Start with the parts you need to ship. Review round duct sections, axial fan housings and segmented elbows by diameter, material and joint design. For rectangular duct work, review the flange and folding sequence separately.
Request a Duct Line Layout View equipment and process routes ↓See factory photos ↓Example workflow for welded round duct
- Prepare and cut the blank
- Roll the duct shell
- Fit and weld the longitudinal seam
- Form the ends or fit flanges as required
- Inspect and unload
The video shows sheet feeding, four-roll forming and discharge of the round duct shell. Your line can also include leveling, blank cutting, straight-seam welding and end flanging or flange fitting, depending on your part and production requirements. Share your duct diameter, wall thickness, seam and flange details, and target output so we can confirm which stations to include in your quote.
See how the equipment fits together




Welding and flanging stations
Review these station layouts against your part drawing, then confirm the fixture and access requirements for your line.




Duct Production Photos
Workshop photos show rolled round shells, flanged duct sections and welded segmented elbows.





Axial fan housings and flanges
Choose between forming the shell edge and fitting a separate flange ring. Confirm the flange profile, bolt-hole pattern and mating dimensions before selecting forming, punching or welding stations.

Segmented duct elbows
Review how the elbow sections will be located, clamped and joined. Use your joint drawing and part mix to assess fixture changes, weld access and the case for a dedicated or robotic station.

Rectangular ducts
Review the line layout against your cross-sections, blank sizes and flange system. Define which operations belong in scope, from feeding and notching to flange forming and folding.
Choose the route by finished part
Use your smallest, largest and most difficult parts to define which operations to automate and which machines can stay in your current workflow.
| Part family | Indicative route | Decision to confirm |
|---|---|---|
| Small-diameter round duct | Uncoil or feed blanks → level and cut as required → servo roll → discharge. Add a seam station if welded shells are in scope. | Minimum diameter at the actual material and thickness, unsupported length and unloading clearance. |
| Welded axial fan housing | Prepare blank → pre-bend and roll → clamp and weld the longitudinal seam → form the end or fit and join a ring. | Roundness after welding, end alignment and the flange interface. |
| Segmented elbow | Cut and form gores → fit and tack → position and weld each joint → inspect the completed elbow. | Gore fit-up, seam access, the full elbow angle and changeover between sizes. |
| Rectangular duct | Feed and level → notch or punch → cut → form flanges and fold in the order required by the joint design. | Flange system such as TDF or separate angle, smallest section, corner detail and straight versus U-shaped layout. |
What each station must do
Open any station to see what it does and what your quote should specify. Select the modules your parts require.
01Coil feeding and levelingCoil-fed setup
Start with an uncoiler and leveler if the line receives coil. With pre-cut blanks, review a sheet-loading and alignment station instead.
Confirm in your quote
Coil width, inner diameter, maximum coil weight, material grade and the condition of the sheet at the cutter.
02Blank cutting and transferShear or laser
Compare a shear for straight cut-to-length blanks with laser cutting where profiles, notches or holes belong in the flat blank. Define how the blank is squared and transferred.
Confirm in your quote
Blank size range, cut-edge condition, dimensional tolerance and how the next station receives each blank.
03CNC rolling and pre-bendingSmall diameter or industrial shell
Evaluate a servo four-roll concept for repeated small-diameter parts or a hydraulic four-roll concept for larger shells. Review end pre-bending, shell support and release before you select a machine.
Confirm in your quote
Outside diameter, length, material strength and thickness together. Run the smallest diameter and the most demanding material combination.
04Straight-seam fit-up and weldingHorizontal or vertical station
Use a locating and clamping fixture to align the two edges before welding. Select the welding process after reviewing joint gap, access, material and the required weld finish.
Confirm in your quote
Seam length, joint gap and edge mismatch, workpiece orientation, weld method, and any requirement to flatten or finish the seam.
05End forming, flanging and punchingIntegral edge or separate ring
Choose direct end forming for an integral flange or a separate ring when the mating assembly calls for one. Scope rolling or forming the ring, bolt-hole production and joining as needed.
Confirm in your quote
Flange width and profile, bolt-circle diameter, hole size and count, end-face flatness and how the flange mates with the next part.
06Segmented elbow weldingDedicated fixture or robot cell
Define whether gores are tack-assembled upstream. Review the locating fixture, part positioner and access to each seam. Evaluate seam sensing when joint position varies across batches.
Confirm in your quote
Elbow diameter and angle, number of gores, seam positions, fit-up variation, weld acceptance and the loading or changeover time.
07Discharge and line controlsStandalone stations or linked line
Define where shells are supported, handed off, buffered or unloaded. Agree how part recipes, station-ready signals and recovery after an interruption are handled.
Confirm in your quote
The boundary between existing and new equipment, manual tasks, utilities, controls interface and the slowest station in the agreed cycle.
Agree on the checks before the trial
Agree which representative parts to run, who supplies the samples, how each result is measured and what counts as a pass.
| Check | Evidence to request |
|---|---|
| Shell geometry | Record diameter and roundness at agreed locations, shell length and the straightness or mismatch at the longitudinal joint. |
| Weld and flange fit | Document fit-up and weld appearance. Check flange flatness, hole alignment and fit against the mating component. Include leak testing only where required by the agreed specification. |
| Throughput and changeover | Time repeated cycles with loading, transfer, welding and unloading included. Record manual tasks, the batch size, and the time to change to a second size. |
| Handover | Confirm which fixtures, recipes, manuals, drawings, spares and operator training are included. |
What to include in your duct line brief
- Part drawings and material grades, with thickness range and smallest and largest sizes.
- Seam, flange and hole details, plus the operations you already run in-house.
- Target parts per shift, batch mix, factory layout, available floor space and power supply. If you are connecting to an existing line, list the equipment to integrate.
- Sample acceptance criteria such as roundness, end alignment and flange fit. Include a leak-test requirement if it applies.
